Tootal Building
This project comprised the refurbishment and redevelopment of the ground floor external courtyard area.
JLF scope of works included:
- Below ground drainage design and detailing. The courtyard area was located above an underground car park for the building, therefore all surface water drainage was required to be hung from the ceiling of the car park and routed into the existing building drainage.
- Design and detailing of baseplate connections for the proposed feature lighting columns.
- Design of detailing spreader steels for the proposed feature trees and plants. Steels were designed to spread the weight across the floor slab back to the primary beams and columns and to avoid heavy point loading on the existing slab.