December 13, 2023
In
Tootal Building
This project comprised the refurbishment and redevelopment of the ground floor external courtyard area. JLF scope of works included: Below ground drainage design and detailing. The courtyard area was located above an underground car park for the building, therefore all surface water drainage was required to